Major progress this week!! We are so much closer to a move in date!! Brandy rolled the ceiling, but poor Larry was stuck doing the trim since he was the only one tall enough to reach the light fixture!
Sewing studio acquires a floor and the 1/2 bath has fixtures and flooring.
Shelves going in for my sewing studio. I wonder how long it will take me to fill them up?!!?
The a/c is now working in the Lizard Lounge. This is such good news for everyone working there and in the sewing studio!!
More worker bees!! Brandy and Nadia are hard at it!! Here's Nadia:
And she even has a BIG smile when she is working!!
Brandy is doing the bulk of the painting of the sewing studio, in spite of Nadia's assistance!!
These ceiling are 11 feet tall. I am happy her balance is as good as her painting skills!!
And here is my little project: Replacing 20 handles and 56 knobs in the kitchen. I can be so anal at times!!
No comments:
Post a Comment